Rate Cost Code vs Fixed Cost Code - What is the difference?
Corfix currently supports two different types of cost codes in the Timekeeping feature. Rate cost codes and Fixed cost codes.
Fixed Cost Code | Rate Cost Code |
Fixed cost codes can be assigned a value (example: Worker did an 8 hour shift and 2 of the hours of that shift need to be tagged to cost code - General Labour
|
Rate costs codes are assigned to a timecard but a value cannot be set to the cost code.
|