How do I move to a different week in Scheduling?
Use the arrows in the date bar to step forward or back a week at a time.
Quick answer
Click the left or right arrow in the date bar to move to the previous or next week. The week range shown (for example, 7/6/2026 to 7/12/2026) updates to match.
Overview
Scheduling shows one week at a time, and the date bar is how you move between them. This matters because everything else on the board — the grid, the cards, and the status filters — reflects only the week currently displayed. Moving weeks doesn't change any data; it just changes which week's cards you're looking at.
Before you begin
- Changing the date range is available to admins in the web portal.
Steps
- Find the date bar at the top of the Scheduling board, showing the current week's range.
- Click the right arrow to move forward to the next week.
- Click the left arrow to move back to the previous week.
- Confirm the range updates. The displayed dates change to reflect the new week, and the grid's day columns update to match.
- Repeat as needed to step further forward or back, one week at a time.
Use cases
- Planning ahead: step forward a week or two to lay out staffing before it's needed.
- Reviewing the past: step back to confirm what was actually staffed on a previous week.
Troubleshooting
My cards disappeared after I moved weeks. Nothing was deleted — the board only shows one week at a time. Step back to the week the cards were created on, or click Today to return to the current week.
Can I jump more than one week at a time? Based on current source material, only single-week steps via the arrows are confirmed. If a longer jump or date picker exists, it isn't documented here — flag with product if this comes up.